Analisa Performa Turbin Gas Unit 1 pada Pembangkit Listrik Tenaga Gas PT A Kepri

  • Rahmat Novri Jon Politeknik Negeri Batam, Batam, Indonesia
  • Fauzun Atabiq Politeknik Negeri Batam, Batam, Indonesia

Abstract

Abstract—The research in this final project is focused on analyzing ther performance of gas turbines. The gas turbine power plant is analyzed using the technical data of the plant. The data used in this study were obtained from the PLTG PT A Kepri. The research methodology is based on qualitative and quantitative research. The result of the analysis in this study are for a period of six months (April-September) 2022. This study shows that 87% of the expected capacity is available in the period studied. Plant Thermal effeciency ranged from 23% to 28%, Plant Capacity Factor ranged from 61% to 81%, and plant reliability ranged from 46% to 100% (averange 75,5%). For the period studied only 27 MW of power was lost from the expected power of 210 MW. In this study, the gas turbine performance parameter analyzed at PLTG PT A Kepri are within the best industry practice range.

References

[1] H. Dwipayana and M. A. A. Baraf, “Analisis Perbandingan Performansi Pembangkit Listrik Tenaga Gas Tm 2500 Jakabaring Unit 2 Dan Unit 3 Pada Waktu Beban Puncak,” vol. 6, no. 2.
[2] B. P. Ichtiarto, “Analisa kinerja pembangkit turbin gas PT PJB Unit Pembangkitan Muara Tawar menggunakan Generating Availability Data System,” O p e r a t i o n s E x c e l l e n c e, 2018.
[3] R. Prasetiyo, P. Bismantolo, and A. Suandi, “Maintenance Pada Combustion Section Turbin Gas Unit 2 Pltgu,” 2021.
[4] N. Gusnita and K. S. Said, “Analisa Efisiensi dan Pemanfaatan Gas Buang Turbin Gas Alsthom Pada Pembangkit Listrik Tenaga Gas Kapasitas 20 Mw,” vol. 14, no. 2, 2017.
[5] M. Faizal, B. T. Prasetyo, and E. S. Effendy, “Analisis Performance Tm2500 Gas Turbine Generator Package Pltg X Pada Factory Test Dan Site Test,” BT, vol. 13, no. 2, p. 157, Dec. 2017, doi: 10.54378/bt.v13i2.214.
[6] Kartono, Sekti Kunthi, and Tina Mulya Gantina, “Evaluasi Kinerja Turbin Gas Abb Gt 13-E1 Di Pt Indonesia Power Ubp Priok,” ENERGI, vol. 2, no. 1, pp. 122–128, Feb. 2020, doi: 10.35313/energi.v2i1.1782.
[7] A. Naufal, “Analisis Termodinamika Performa Turbin Gas Sebelum Dan Sesudah Major Inspection Overhaul Di Pltgu Unit Gt 1.2 Omu Ip Cilegon,” 2021.
[8] B. A. Wibowo, “Analisis kinerja turbin gas (GT 3.1) PLTGU Muarakarang setelah masa konstruksi sesuai ISO 2314:2009,” vol. 1, no. 1.
[9] R. Syammary, “Analisis Efisiensi Turbin Gas Tipe V94.2 Sebelum dan Sesudah Minor Inspection Pada Blok 4 Unit 3 Pltgu Muara Tawar,” vol. 8, no. 2, 2020.
[10] H. M. Karusitio Silaban and A. Ghofur, “Analisa Performa Turbin Gas Tipe Cw251 B11 Pada System Pembangkitan Listrik Tenaga Gas Sektor Pembangkitan Bali,” JTAM ROTARY, vol. 2, no. 2, p. 161, Sep. 2020, doi: 10.20527/jtam_rotary.v2i2.2412.
[11] O. E. William, “(A Case Study Of Delta Iii Gt9 Transcorp Gas Turbine Power Plant, Ughelli, Nigeria),” vol. 6, no. 6, 2018.
[12] M. A. Partogi, I. G. B. Wijaya Kusuma, and K. Astawa, “Analisa Unjuk Kerja Sistem PLTG di PT Indonesia Power Unit Pembangkitan Bali,” METTEK, vol. 4, no. 1, p. 16, Apr. 2018, doi: 10.24843/METTEK.2018.v04.i01.p03.
Published
2023-12-22
How to Cite
JON, Rahmat Novri; ATABIQ, Fauzun. Analisa Performa Turbin Gas Unit 1 pada Pembangkit Listrik Tenaga Gas PT A Kepri. Journal of Applied Electrical Engineering, [S.l.], v. 7, n. 2, p. 97-101, dec. 2023. ISSN 2548-9682. Available at: <http://704209.wb34atkl.asia/index.php/JAEE/article/view/5966>. Date accessed: 28 nov. 2024. doi: https://doi.org/10.30871/jaee.v7i2.5966.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.